Please perform a systematic review of literature in order to propose a algorithim framework for the utilization of artifical intelligence and machine learning in rotorcraft path planning. First review the problem description and powerpoint to get a sense of the project before beginning. Propose some type of solution to solve the problem. Please use the template to produce the same format, example to review format, outline for ideas and most importantly the rubric. Please propose complete up to literature review and a technical approach that uses the AFSIM environment and support chosen algorithims with mathematics whenever possible. Feel free to deviate from outline as needed.
Category: Engineering
-
“Analyzing Customer Order Data: Identifying Key Questions for Effective Analysis”
I have a dataset and I am trying to analyze it. I need someone who can understand the data and my thesis within the short period and identify questions that can help answer
Important Info
The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.
Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc) -
Title: The Impact of Social Media on Mental Health: A Literature Review
Do a literature review an introduction and a one main point topic all 14 pages in total
Important Info
The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.
Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc) -
“Exploring Construction Risk Factors and Mitigation Strategies: A Comprehensive Analysis”
I am looking for someone with a strong background in civil engineering to assist me in writing a research paper on the following topics related to construction risk factors and their potential impacts on building operations. Each topic should be addressed in a separate 5-page section. Below are the topics:
1- Investigation of Various Risk Factors in Building Construction and Their Potential Impacts on Construction Operations:
2- Analysis of Soil Problems and Their Significance for Construction:
3- Study of the Impact of Weather Conditions on Construction Operations:
4-Analysis of Construction Defects and Their Potential Impacts on Construction Operations:
5- Development of Strategies and Measures for Effective Risk Minimization in the Construction Process:
6-Evaluation of the Effectiveness of Developed Risk Minimization Strategies: -
“Optimizing Traffic Signal Timing for Increased Safety: A Case Study in Virginia Beach”
To complete Part 1 follow the below instructions:
You will consider four intersections of width: 90, 120, 150, and 180 respectively.
For each intersection, you will assume four different posted speeds of 30, 35, 45, and 50 mph.
Based on the equations in your Excel template, you will calculate the Yellow Change Interval and the Red Clearance Interval.
You will calculate the total time to switch to Red by adding the Yellow Change Interval and Red Clearance Interval.
Traffic camera will snap a shot after the total calculated time and an allowance of 0.5sec to capture Red light violations.
Create four charts showing the change in the Yellow change interval, Red clearance interval, and the total Change time for each posted speed.
The equations used for
Y (sec) is ‘=(F4+((1.47*C4)/(2*G4+64.4*D4)))’
R (sec) is ‘=((E4+H4)/(1.47*C4))-1’
TV (sec) is ‘=I4+J4+0.5’
The Insurance Institute for Highway Safety, IIHSLinks to an external site., states on their site that “Providing adequate yellow signal time is important and can reduce crashes. Studies have shown that increasing yellow timing to values associated with guidelines published by the Institute of Transportation Engineers can significantly decrease the frequency of red light violations and reduce the risk of total crashes, injury crashes, and right-angle crashes (Bonneson & Zimmerman, 2004Links to an external site.; Retting & Greene, 1997Links to an external site.; Van Der Horst, 1988Links to an external site.; McGee et al., 2012Links to an external site.).
You will design an Excel spreadsheet that calculates the allowable yellow light interval before changing to red and the red clearance interval based on the Virginia Beach Signal Timing Information.Download Virginia Beach Signal Timing Information.
The equations that you will implement in your Excel spreadsheet calculator are available on slide 5 of the Signal Timing information.
Your Excel Spreadsheet should show the following:
Posted Speed Limit
Adjusted Speed limit
Intersection width
Vehicle Length
Yellow Change Interval
Red Clearance Interval
Total interval to come to a stop
You will create charts showing the change in the Yellow change interval, Red clearance Interval, and the total Change time for each posted speed used. You will discuss in Part 3 of your project your conclusion based on those results.
You can investigate in your Excel spreadsheet different reaction times, deceleration rates, and vehicle length. -
“Improving the Coherence and Flow of a Comparative Analysis of the Construction Industry in Saudi Arabia and Other Countries” Introduction The construction industry is a vital sector for economic growth and development in many countries. It is responsible for creating infrastructure, such as
Please do the needed editing for the attached file. The overview section is done by other person while the Saudi Arabia′s construction industry done by me, and I don’t feel that the ideas are connected between the sections.
-
Title: Code Compliance for Door and Stair Width in an I2 Occupancy Building
Calculate the width of doors and stairs and determine code compliance, based on problem presented.
You have to start with building area.
Then, find occupant load.
Then, find actual width of door and stairs based on Table 1004 and Section 1005 coefficients.
Then, verify compliance with Code sections 1010.1.1 and 1011.2. Be very careful, reviewing 1010.1.1 considering your occupancy is I2. Read assignment for problem. -
“Race Against Time: Solving 7 Challenging Problems in 2 Hours”
Hi, I need help completing 7 problems I have 2 hours to complete them. these are problems that could be similar to what they are.
-
“Editing and Polishing 11 Engineering Reports for Professional Civil Engineering Registration”
i am trying to register as a professional civil engineer. i have written 11 reports including an engineering report. i need someone to edit them and make it fit to submit to ecsa.
-
“Predicting Future Traffic: Understanding the Formula F=P(1+i)n”
please read my assignment with understanding good before taking it . do not just do anything like trying, i know piece of the assignment. this is the formula to begin. F=P(1+i)n. F is for future traffic, P is for present traffic, i for the growth rate, and n of the number.