  • Final Report – Implementation of Solution and Feasibility Analysis

    Content
    Requirements (in no specific order):
    Check
    what you are missing from the feedback of previous assignments, point by
    point, and implement it in the final report. Only include missing parts
    from before. No copy/paste repeat of any content already submitted
    1-page
    intro: again, remind me of the
    project/company/need/problem/solution
    Goals:
    how does your final solution
    meet the original goals presented in your proposal
    Finalize
    the solution: its specs, design,
    pilot, full implementation, functionality, features, etc.
    Procedure:
    show the procedures/method you
    performed to come up with the final solution. You may need to present
    science/theory here with reference to MEM content and/or external
    APA-cited references.
    Process: show the original process (if you must have one) as it was
    before May and the new process as it is in December; highlight the
    sections where you introduced changes/modifications. Link blocks in the
    process to IDs in your master WBS. If you didn’t have a master WBS with
    IDs, build one.
    Feasibility
    analysis: of the solution in full
    detail and figures, taking into account all aspects of opex/capex expenses
    Final
    Gantt chart: outlining tasks performed over
    the last 8 months, and what will happen (if any) in the next while to
    reach the ultimate results of your proposal. Yes, some of you have
    projects that will go on after the final report submission date. This
    section is very important and should be explained in full detail. Gantt
    chart tasks should match IDs of what you presented in your master WBS.
    Final
    budget of all amounts spent up to
    date, and the amount remaining to be spent to meet the needs of the full
    implementation of the proposed solution (spending should match the task
    IDs in your master WBS). Some of you will have implemented the complete
    solution by end of term, and in this case, the budget is final.
    Whereas some of you are still in the pilot stage, in which case, you need
    to show a budget with columns; one for up-to-date spending and another for
    the remaining amounts to be spent until all goals are achieved. All items
    need to be explained.
    Quotations:
    If there are any
    equipment/services purchased in your solution/budget, formal quotations
    need to be provided.
    Stakeholder
    contributions: what did all
    stakeholders do? The contributions should reference IDs for tasks in your
    master WBS. If you don’t have a master WBS with IDs, build one
    Changes
    in project scope, schedule, or budget:
    if anything changed and/or certain tasks were not completed as promised,
    feel free to outline them and present a satisfactory justification for the
    change